Swalwell Industry

Derwenthaugh 1950

Fulham ? . A collier of the Central Electricity Generating Board (CEGB). at Derwenthaugh staiths about 1950. Built at Burntisland in 1948 and of 1596 GRT, she carried North West Durham coal to the power stations on the Thames above London Bridge. The bigger collier lying alongside the staiths is not identified.

Back to the Industry page